Opening a restaurant demands precision. Use this checklist to reduce delays and pass inspections the first time.

1) Pre-Design & Approvals

  • Confirm zoning, occupancy, and use change.

  • Health department requirements: hand-wash sinks, grease traps, ventilation, surfaces.

  • Site survey: existing utilities, slab condition, hood routing.

2) Concept & Design

  • Kitchen workflow (prep → cook → plate → pass).

  • Seating plan, accessibility, fire egress.

  • MEP coordination: hood, make-up air, gas, electrical loads, drainage.

3) Permits & Submittals

  • Building permit set (architectural, structural if needed).

  • MEP drawings, hood/ANSUL fire suppression, grease interceptor details.

  • Signage and patio permits (if applicable).

4) Construction Phases

  • Demolition & rough-in: plumbing, electrical, HVAC, hood ducting.

  • Framing & drywall: fire separations, rated assemblies.

  • Finishes: washable walls, quarry tile, non-slip kitchen flooring.

  • Millwork & equipment: NSF-grade counters, cold storage, line equipment.

 

5) Inspections & Commissioning

  • Rough-in inspections (MEP, framing).

  • Hood/ANSUL test; fire alarm and sprinklers if required.

  • Final health inspection; occupancy certificate.

6) Budget & Schedule Drivers

  • Hood path and roof curb penetrations.

  • Grease interceptor sizing and location.

  • Electrical service upgrades; panel capacity.

  • Lead times: kitchen equipment, specialty finishes.

7) Pre-Opening

  • Deep clean; equipment start-up and balancing.

  • Staff training; mock service.

  • Punch list and warranty handover.

Pro tip: Lock long-lead items in preconstruction to keep your opening date.